Projects
Introduction
Metropolitano de Tenerife (Metrotenerife) is a public transport company established in 2001 with the aim of providing a competitive transport service as railway lines on the island of Tenerife.
Metrotenerife has the commitment of Cabildo de Tenerife for the development of island rail projects, the future extensions and new lines of the tram network and the train projects to the south and north of the island.
Extension of the Line 1
EXTENSION OF THE LINE 1 TO LOS RODEOS AIRPORT
- DESCRIPTION: Extension of Line 1 tram from Trinity Avenue to the Los Rodeos Airport
- OBJECTIVES: Service the San Lazaro district of San Cristóbal de La Laguna and the airport of Los Rodeos
- STOPS: 4
- MUNICIPALITIES WITH STOPS: San Cristobal de La Laguna
- POPULATION SERVED: 9.443 inhabitants
- LENGTH: 2.5 km
- CURRENT STATUS: Study of alternatives performed
Extension of the Line 2
EXTENSION OF THE LINE 2 TO LA GALLEGA
- DESCRIPTION: Extension of Line 2 tram from Tíncer to La Gallega
- OBJECTIVES: Provide service to the neighborhoods of El Sobradillo, Barranco Grande and La Gallega
- STOPS: with 4 tramstops: Muñeco de Nieve, El Sobradillo, Barranco Grande and La Gallega
- MUNICIPALITIES WITH STOPS: Santa Cruz de Tenerife
- POPULATION SERVED: 13.849 inhabitants
- LENGTH: 3.1 km
- CURRENT STATUS: Drafted construction project
Ampliación Línea 2 a La Gallega
Toda la información sobre el proyecto
Line 2 extension alternative to Muñeco de Nieve
Watch video on Youtube (external link)
Line 3 Santa Cruz North Pier
NEW LINE 3 SECTION TRADE FAIR CENTRE- NORTH PIER
- DESCRIPTION: A Section of the new tramline between the fairgrounds and the North Pier of Santa Cruz de Tenerife
- OBJECTIVES: Provide service to the neighborhoods of La Salle, San Sebastián, Duggi, Zona Centro, The Hotels, Toscal, Residential Anaga of Santa Cruz de Tenerife
- STOPS: 6
- MUNICIPALITIES WITH STOPS: Santa Cruz de Tenerife
- POPULATION SERVED: 25.317 inhabitants
- LENGTH: 3 km
- CURRENT STATUS: Study of alternatives performed
Line 4 Hospital Universitario La Candelaria (Line 1) – Añaza
NEW LINE 4: HOSPITAL UNIVERSITARIO LA CANDELARIA (LINE 1) – AÑAZA
- DESCRIPTION: A Section of the new tramline between the Line 1´s stop H. U. La Candelaria and Añaza´s neighborhoods
- OBJECTIVES: Provide service to the neighborhoods of Las Moraditas, San Matías, El Draguillo, Santa María del Mar, Acorán y Añaza of Santa Cruz de Tenerife
- STOPS: 8 (7 news)
- MUNICIPALITIES WITH STOPS: Santa Cruz de Tenerife
- POPULATION SERVED: 22.576 inhabitants
- LENGTH: 6,1 km
- CURRENT STATUS: previous studies
Line 4 H. U. La Candelaria (Line 1) – Añaza
In the following button you can see a video about the layout of this new tram line
Tenerife Train Project
- Project planning, financial model, basic and construction projects for the South Train and the North Train.
- Construction projects for transport interchanges.
- Substation and energy projects.
- Freight transport viability.
For further information